If you have already searched for this, you may have come across various websites or pages citing different dates (2026, 2027, 2028, 2029) and varying unit counts (ranging from 320 to 895). This isn't because you misread the information; in reality, the market is conflating three distinct RERA-registered phases that all share the name "Waterfall." Before deciding to book or purchase a resale unit, it is crucial to know exactly which phase you are looking at.
This page is designed to clear up this confusion. It cross-references information with official RERA filings and provides a clear update on the current stage of construction.
Krisumi Waterfall Suites (Krisumi City, Sector 36A, Phase 2 of Dwarka Expressway) is registered under RERA with the registration number RC/REP/HARERA/GGM/715/447/2023/59. It comprises 320 studio/service apartment units housed in a single high-rise tower on a 3.87-acre plot, with possession scheduled for December 2028 according to RERA filings; construction is currently in the structural/superstructure phase. A separate phase—Waterfall Suites II (RERA GGM/816/548/2024/43, comprising 439 units, approved in February 2024)—is often clubbed together with the first phase in listings on property portals, leading to confusion elsewhere online regarding the total number of units and the land area.
Krisumi City is a 65-acre master-planned township being rolled out in phases:
Phase | Project Name | RERA No. | Status | Units |
1 | Waterfall Residences | RC/REP/HARERA/GGM/2018/03 | Delivered / nearing full possession | 433 (+77 EWS) |
2 | Waterfall Suites | RC/REP/HARERA/GGM/715/447/2023/59 | Under construction | 320 |
4 | Waterfall Suites II | RC/REP/HARERA/GGM/816/548/2024/43 | Under construction (newer launch) | 439 (+78 EWS) |
Future | The Forest Reserve / Waterside Residences | Pre-launch / new launch | Not yet under construction | TBD |
Most aggregators combine the 'Suites' and 'Suites II' listings into a single "Krisumi Waterfall Suites" page and average out the details—which is why you might see figures like "895 units" or a possession date of "December 2029." While both figures are accurate, they pertain to two separate RERA registrations rather than a single project. If you are considering a specific unit, ask the sales team which RERA number applies to it. Be sure to do this before relying on any possession date found online, as RERA filings are the only definitive source, and these details are subject to change.
Before labeling any project as "under-construction," it is important to understand the nuances; in Gurgaon's market, this term can mean anything from "the boundary wall is up" to "60% of the structure is complete."
Specifically regarding Waterfall Suites: the project received fresh building plan approval in January 2023 and RERA registration in mid-2023, after which active tower construction began. It is a high-rise tower of approximately G+32 floors (sources vary between 32 and 34 floors, illustrating just how carelessly this data is tracked). While the Krisumi site gallery displays the progress of the façade design and structural work, there is a significant flaw in the developer's communication: none of the publicly available construction gallery images are dated. This makes it impossible for a buyer to gauge the pace of construction solely from the website.
If you are currently considering this project, here is some practical advice: do not rely on brochure renders or undated photo galleries. Either request a dated site video during a call or—even better—book a physical site visit. Based on our experience tracking project launches in Gurgaon, developers who are genuinely ahead of schedule are happy to share dated drone footage. If they hesitate to provide a video with the current date, that in itself is a red flag worth noting, regardless of which project you are considering.
Krisumi’s first phase—Waterfall Residences—has a track record of timely or even early completion. Such a record is rare in this market and serves as strong evidence that Waterfall Suites will likely be completed in a similar manner. However, the timely completion of the first phase does not guarantee a specific timeline for the second phase; factors such as contractor selection, funding priorities, and approval processes can vary between phases. View this as a positive indicator, not a guarantee.
You can verify this directly on the Haryana RERA portal (haryanarera.gov.in) — do this yourself rather than trusting any third-party listing, including aggregator sites that show the RERA number but haven't cross-checked the unit count against the actual filed documents.
Why the JV structure matters for risk assessment (not just as a branding point): Krishna Group's core revenue base is automotive, not real estate — Krisumi is a diversification bet for them, executed in partnership with Sumitomo's construction and project-management expertise. That's generally a reasonable structure — Sumitomo brings execution discipline, Krishna Group brings local market and land access — but it does mean the project's funding runway is partly tied to a parent group whose primary business is elsewhere. This isn't a red flag on its own; RERA-mandated escrow accounts exist precisely to protect buyer funds from exactly this kind of cross-business risk. It's simply a factor worth monitoring through quarterly updates rather than ignoring.
Sector 36A is situated directly along the Dwarka Expressway, located approximately 2 km from NH-8 and half a kilometer from the expressway itself. The completion of the Dwarka Expressway corridor has significantly transformed the investment landscape in this area over the past five years; property prices have surged from around ₹8,500 per square foot in 2019 to approximately ₹24,000 per square foot by 2025. This appreciation is not driven by the launch of any single project but is primarily due to the completion of the expressway and the subsequent development of commercial and social infrastructure.
This is a crucial perspective to keep in mind when reading "construction updates": in a rapidly developing corridor, a project's completion timeline tells only half the investment story. The other half depends on whether the surrounding infrastructure—such as metro connectivity, commercial hubs, and the NHAI cloverleaf junction connecting the Dwarka Expressway, CPR, NH-8, and SPR—is evolving at a similar pace. This has largely been the case with the Dwarka Expressway, which is one reason why this corridor has outperformed many established areas of Gurgaon in terms of price appreciation.
If possession is expected in December 2028, you would need to hold the property for at least two years prior to taking possession; and given that under-construction projects in this market often face delays, this duration could extend even further. Because of this timeframe, the choice between a Construction-Linked Plan (CLP) and a Down Payment Plan (DP) is not merely a superficial decision—it alters your actual cost of capital.
Given that even this specific project's public listings can't agree on a possession year within a 12-month range, a more construction-linked plan is the more defensible default here unless you have a specific reason (documented pre-launch pricing, a resale exit plan within 12 months, etc.) to prefer the discount.
This is a studio/service-apartment product, not a family-format flat — so the investment thesis rests more on rental yield and resale liquidity in a corridor with growing corporate and NRI demand, and less on end-use appeal. If that's your angle, three things are worth tracking over the next 12–18 months rather than a one-time decision:
Disclaimer: Pricing, appreciation percentages, and possession timelines cited above are drawn from publicly available RERA filings and market data as of the last-updated date on this page. Real estate timelines and prices are subject to change; verify current figures directly with Krisumi Corporation and the Haryana RERA portal before making any financial decision. This is not investment advice.
Is Krisumi Waterfall Suites delayed?
As of the last RERA-linked update available, there is no formal delay notification on the RERA portal for this registration. However, given the conflicting possession dates circulating across listings (2028 vs 2029), buyers should verify the current committed date directly against the RERA filing rather than any secondary source.
What's the difference between Waterfall Suites and Waterfall Suites 2?
They are two separate RERA registrations under the same Krisumi City master plan. Waterfall Suites (GGM/715/447/2023/59) has 320 units on 3.87 acres, approved in 2023. Waterfall Suites II (GGM/816/548/2024/43) has 439 units on a smaller 0.785-acre parcel, approved in February 2024. They are frequently listed together by portals, which causes the unit-count confusion seen across the web.
Who is developing Krisumi Waterfall Suites?
Krisumi Corporation Private Limited, a joint venture between Sumitomo Corporation (Japan) and Krishna Group (India). Architectural design is by Nikken Sekkei.
Is Krisumi a trusted builder in Gurgaon?
Krisumi's flagship Phase 1, Waterfall Residences, has a track record of on-time or ahead-of-schedule delivery, which is a genuine positive signal in this market. Track record on earlier phases doesn't guarantee identical performance on later ones, so ongoing verification is still worthwhile.
Is Krisumi Waterfall Suites a good investment?
The Dwarka Expressway corridor has shown strong appreciation over the past five years, and the studio-format product is positioned for rental yield rather than end-use. Whether it suits you depends on your holding period, liquidity needs, and comfort with a 2+ year under-construction horizon — this isn't a one-size-fits-all answer, and isn't financial advice
Signature Sidhrawali Plots
Signature Daxin Vistas
JMS The Majestic
JMS Plots Sector 95B Gurgaon
Signature Tonino Lamborghini
Krisumi Waterfall Suites
Krisumi The Forest Reserve
Krisumi Waterside Residences
Krisumi Waterfall Residences
Max Estates Antara Gurgaon
Max Estates The Terraces
Max Estates Antara
Get exclusive access to premium homes, investment opportunities, latest price offers, and expert guidance from real estate specialists.